(Grav GitSync) Automatic Commit from tanshu

This commit is contained in:
tanshu 2019-07-16 02:35:08 +00:00 committed by GitSync
parent 2bd4764926
commit b9ad0c79fe
1 changed files with 3 additions and 3 deletions

View File

@ -29,9 +29,9 @@ UV Filter
TDS Adjuster to control the TDS (Input from before the membrane and output to after the membrane but before the uv filter) TDS Adjuster to control the TDS (Input from before the membrane and output to after the membrane but before the uv filter)
[https://www.amazon.in/PARIJATA-Water-Purifier-TDS-Adjuster/dp/B071GYQN8F/ref=sr_1_3?crid=14JSQBCO3GK9Y&keywords=tds+adjuster&qid=1563217638&s=gateway&sprefix=batteries+%2Caps%2C281&sr=8-3](Sample) [https://www.amazon.in/PARIJATA-Water-Purifier-TDS-Adjuster/dp/B071GYQN8F/ref=sr_1_3?crid=14JSQBCO3GK9Y&keywords=tds+adjuster&qid=1563217638&s=gateway&sprefix=batteries+%2Caps%2C281&sr=8-3](Sample)
Pressure tank after (35L should be fine) Pressure tank after (35L should be fine)
https://www.autoconindia.in/pressure-tank.html [https://www.autoconindia.in/pressure-tank.html](Option 1)
https://www.aventura.co.in/pressure_boosting_tanks.html [https://www.aventura.co.in/pressure_boosting_tanks.html](Option 2)
https://www.industrybuying.com/pumps-1160/pressure-tank-4421/ [https://www.industrybuying.com/pumps-1160/pressure-tank-4421/](Option 3)
line after uv tank T to ro and outlet and a high pressure switch there to turn off the ro when the pressure is high. then a T ... one to the ice machine and other to the water tank line after uv tank T to ro and outlet and a high pressure switch there to turn off the ro when the pressure is high. then a T ... one to the ice machine and other to the water tank