(Grav GitSync) Automatic Commit from tanshu

This commit is contained in:
tanshu 2019-07-16 02:30:42 +00:00 committed by GitSync
parent 87ea84b747
commit 54cbf1f15c

View File

@ -43,4 +43,11 @@ Pressure should be around 60 psi (The Ice machine requires 20-80 psi Manitowoc a
300GPD will give 40 Ltrs / hr and is also a good idea for upgrade to the basement RO. Only the Pump and RO needs to be upgraded
**Clean and sanitize Ice Machine every 4 months**
**Clean and sanitize Ice Machine every 4 months**
### Electrical Connections
1. Mains into the SMPS
2. Pump and Solenoid together into the SMPS out
3. Low Pressure (LP) switch between the SMPS out Live (Red) and the Pump/solenoid to cut out pump in case of no input water
4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized