(Grav GitSync) Automatic Commit from tanshu
This commit is contained in:
parent
1ae82380f2
commit
48c534b753
@ -1,5 +1,6 @@
|
|||||||
---
|
---
|
||||||
title: 'RO System'
|
title: 'RO System'
|
||||||
|
media_order: ro-102p-1.jpg
|
||||||
---
|
---
|
||||||
|
|
||||||
### Flow of water:
|
### Flow of water:
|
||||||
@ -50,4 +51,6 @@ Pressure should be around 45 psi (The Ice machine requires 14-70 psi Scotsman 60
|
|||||||
1. Mains into the SMPS
|
1. Mains into the SMPS
|
||||||
2. Pump and Solenoid together into the SMPS out
|
2. Pump and Solenoid together into the SMPS out
|
||||||
3. Low Pressure (LP) switch between the SMPS out Live (Red) and the Pump/solenoid to cut out pump in case of no input water
|
3. Low Pressure (LP) switch between the SMPS out Live (Red) and the Pump/solenoid to cut out pump in case of no input water
|
||||||
4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized
|
4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized
|
||||||
|
|
||||||
|
![5 Stage](ro-102p-1.jpg)
|
Loading…
Reference in New Issue
Block a user