From 48c534b753aced6eeebfc39b086fe1ad640398c8 Mon Sep 17 00:00:00 2001 From: tanshu Date: Tue, 16 Jul 2019 17:41:38 +0000 Subject: [PATCH] (Grav GitSync) Automatic Commit from tanshu --- pages/11.ro-system/docs.md | 5 ++++- 1 file changed, 4 insertions(+), 1 deletion(-) diff --git a/pages/11.ro-system/docs.md b/pages/11.ro-system/docs.md index 5f503d6..1b99101 100644 --- a/pages/11.ro-system/docs.md +++ b/pages/11.ro-system/docs.md @@ -1,5 +1,6 @@ --- title: 'RO System' +media_order: ro-102p-1.jpg --- ### Flow of water: @@ -50,4 +51,6 @@ Pressure should be around 45 psi (The Ice machine requires 14-70 psi Scotsman 60 1. Mains into the SMPS 2. Pump and Solenoid together into the SMPS out 3. Low Pressure (LP) switch between the SMPS out Live (Red) and the Pump/solenoid to cut out pump in case of no input water -4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized \ No newline at end of file +4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized + +![5 Stage](ro-102p-1.jpg) \ No newline at end of file