From 23d6aa3ed43788010029ba83ccaf8678231f9bfc Mon Sep 17 00:00:00 2001 From: tanshu Date: Tue, 16 Jul 2019 17:43:03 +0000 Subject: [PATCH] (Grav GitSync) Automatic Commit from tanshu --- pages/11.ro-system/docs.md | 7 ++++++- 1 file changed, 6 insertions(+), 1 deletion(-) diff --git a/pages/11.ro-system/docs.md b/pages/11.ro-system/docs.md index 1b99101..33c75fc 100644 --- a/pages/11.ro-system/docs.md +++ b/pages/11.ro-system/docs.md @@ -53,4 +53,9 @@ Pressure should be around 45 psi (The Ice machine requires 14-70 psi Scotsman 60 3. Low Pressure (LP) switch between the SMPS out Live (Red) and the Pump/solenoid to cut out pump in case of no input water 4. High Pressure (HP) switch between the LP coutout and the Pump/solenoid to stop the pump once the output tank is pressurized -![5 Stage](ro-102p-1.jpg) \ No newline at end of file +### 5 Stage RO With +1. Low Pressure Switch +2. High Pressure Switch +3. Water Tank +4. TDS Adjuster +![](ro-102p-1.jpg) \ No newline at end of file